By Siga

SIGA Majcoat® 200 SOB Breathable Roof Underlay with Integrated Adhesive Strip (1.5 x 50 m; 75 m²)

Sale price:
385,14 € Was: 453,11 €
-15%
Lowest price in last 30 days: 385,14 €
Shipping calculated at checkout.
Availability: Low stock
SKU: SIGA-Majcoat-200-SOB-1.5m
Preces kods: 8765-150050
Sale price:
385,14 € Was: 453,11 €
-15%
Lowest price in last 30 days: 385,14 €

Description

Specifications

SIGA Majcoat® 200 SOB is a breathable, rain tight roof underlay with an integrated double adhesive zone (SOB) for the exterior protection of roof structures with a pitch from 10°, including longer periods of weather exposure. One roll is 1.5 x 50 m and covers 75 m².

The membrane has a 3-layer structure in which the functional layer is protected on both sides by nonwoven. It keeps out precipitation during construction and allows long-term moisture diffusion (sd 0.08 m). The robust membrane has high mechanical and abrasion resistance and can serve as a temporary roof covering for up to 12 weeks.

The integrated SIGA adhesive layer bonds reliably at any temperature, so overlaps are sealed quickly without separate tape. A laying aid and cutting aid are printed on the membrane.

Roof underlay main features

  • Roll size: 1.5 x 50 m (75 m²)
  • Roll weight: 17 kg
  • Integrated adhesive zone (SOB): yes, double-sided
  • Structure: 3 layers, functional layer protected by nonwoven on both sides
  • Thickness: 0.9 mm
  • Mass per area: 198 g/m²
  • sd value: 0.08 m (EN ISO 12572)
  • Water tightness: class W1 (EN 1928)
  • Max. tensile force: 390 N/50 mm lengthwise, 300 N/50 mm crosswise
  • Nail tear resistance: 220 N lengthwise, 240 N crosswise
  • Temperature resistance: -40 to +80 °C, short-term up to +120 °C
  • Fire class: E (EN 13501-1)
  • Temporary roof covering: up to 12 weeks
  • Minimum roof pitch: 10°

Applications

SIGA Majcoat® 200 SOB is designed as an underlay and sub-roof membrane on the outside of the roof structure.

  • Pitched roofs from 10°
  • Underlay on rafters or wood-fibre boards
  • Temporary weather protection during construction (up to 12 weeks)
  • New builds and roof renovation

How to install the roof underlay

Install the membrane on the outside of the roof structure before the counter battens and battens.

  1. Lay the membrane with the printing facing you.
  2. Position the next sheet using the printed laying aid.
  3. Remove both protective strips of the adhesive zone evenly.
  4. Press the joint firmly along its full length.
  5. Fix the membrane with staples above the adhesive strip.
  6. Fix the counter battens directly to the load-bearing structure (e.g. rafters) with suitable screws.
  • Tip: SIGA recommends nail sealing tape under the counter battens for extra weather protection.
  • Tip: SIGA lists Wigluv® 60 and Primur® roll as related products for connections and details.
  • Tip: if wood-fibre boards are used as the underlay, they must be intended for that use and resistant to compression.

Brand

Atklātā laikā

Biezums

Integrētā līmlente

Laukums

Minimālais jumta slīpums

Pielietojums

Platums

Sd vērtība

Svars

Temperatūras izturība

Ugunsdrošības klase

Ūdensnecaurlaidība

Product EN